Dear consumer, it is recommended that you use the authorized service providers to install the products of this company. To apply for the installer to the location, complete the installation request form so our colleagues will contact you.
It is necessary to pay attention to these issues in installing the company’s products.

 

Steps to install a single piece or monoblock toilet

– Be sure to ensure the health of the product and its accessories in the first step.
– Control the position of the product in terms of the position of the legs, the appropriate distance from the walls and in the bathroom.
Tighten the tassels and fittings in place, or tighten them so-called.
– Test the siphon and sewage separately and manually before installation, to ensure that the sewage pipe is functioning properly and open.
-Install the bug on the sewer pipe.
– Close the main body of the water and open the tank cover to fill the reservoir and make sure that the water path is clean.
– Push the small pin (piston) into the pipe.
Match the alexandria on the sewer pipe pipe.
-The sewage pipe should be 2 to 4 cm higher than the floor of the service.
Clean the toilet seat completely.
– Make a towel around the toilet seat from the inner edge of the interior.
Put a tattoo on the floor and clean the adhesive around it with a spatula.
Before use, keep dry for at least 12 hours and do not use toilets to dry completely.
Place the tank cover and release the drain button with the corresponding screw, in the form of a clearance of about 1 to 2 mm. If the rate of clearance is lower or higher, it will disrupt the drainage or make it difficult to seal the system.

 

Steps to install two-piece toilets

The installation of this product in general is similar to the installation of a single piece or monoblock toilet, except that the mechanism connections inside the drainage tank should also be carried out by the installer.

Washbasin / consular installation process
– Attach the cabinet to the wall where the drainage pipe is located and, if necessary, hole the back panel to install the fittings of the taps and sewers.
– Align the cabinet with the base screws.
Insert the screws in the cabinet.
Connect the wall to the wall with its screws.
Scrub the interior of the washbasin and carefully place it on the hole on the top of the cabinet.
Install water siphon and fittings.
– Place the siphon pipe out of the sewer pipe.
-Check the hot and cold water and make sure the products work properly.

 

Stage WC mounting process

– First, remove the tap installation location according to its shape (single base or two legs) from the washbasin. Tap this with a sharp blade from the soft wool to the embedded place. Blows should be gentle and on the side of the product so that the glaze does not damage the hole.
Install the cord and part of the siphon that connects to the sink.
It is better to use a soft and thick fabric or a carton underneath to prevent it from damaging the toilet.
– Place the cushion on its base and level it.
– Mark the wrapping surface on the wall.
Remove the floor and floor and place the marked area with a drill to fit the screws.
Rolle the plaque and bolted screws in the holes.
-Place the screw on the screws.
Place it on the screws.
-Install the base under the washcloth.
– Secure the joints.
– Connect the other siphon connections and insert the end pipe into the sewer pipe on the wall.
Connect the hot and cold water to the walls on the wall and then open them to ensure the correct product performance.

 

Mounting steps of Squat toilets

– Be sure to check the appearance of the product first to make sure that it is healthy.
– The toilets of the walls are so large that they do not prevent the toilet from being used and the body does not contact the wall.
– Fasten the front flush tube into the gasket and glue it around.
Connect the gasket to the desired location where the Flashtan tube is about 1 to 1.5 centimeters deep inside the desired area. If the pipe is inserted less or more, there is a chance that the pipe will not be properly sealed, which will cause the flatstack water to flow properly.
Put the tufts on its place and align with both directions.
– In the case of medical toilets, it is important to keep in mind that the placement of the legs after installation will maintain the desired slope with the floor of the bathroom.

All Rights Reserved by Novinceram. Copyright © 2018

Website Design and SEO by AriazDevs Co. AriazDevs - 2018 ©